Site Preparation

the site demolition
remove wiring cut rebar
caterpillar remove wall

looking up

structure removed

nearly done

rubble
 

Pouring Concrete

dirt basement fill
basement pack start footings
vibrating concrete second load

halfway done

more footings
re-bid slab pour
flatwork crew pouring teamwork
laser screed crane

sawed & sealed

sawing the slab
sealer

 

 

Framing

columns brackets
crane cross beam
forklifts lining up

beam support

bolting a purlin

birds on a wire

 

 

Exterior

gypsum sheathing frame walls
wall wall teamwork
measuring front view

steel trusses

roof is next
get the word a little rain
Simple Saver industrial adhesive
roof tin cutting liner

measuring the roof

front windows
 

Interior

KDOC helps Becky Kester
building walls

serving counters

front hallway

masked man

insulation

holes in the ceiling

utilities

looks like a jungle

taking a "breather"

plumbing

finished insulating

 

 

Finishing

brick front

in the lift

getting a lift

water running

sheetrock

electrical spider

ductwork

stain trim

rolling it on

sanding

cut-in-conduit

jigsaw

cabinets & countertops

power to the island

grouting seams

 
 

Completed!

front entrance

angles

store front

new floor

front entrance inside

ladies restroom

decorative tile

ceiling & floor

flooring process

clock

flooring, close up

finished flooring

loading dock

front foyer

footprints

courtyard